back

Address:
177,Nezavisimosti ave., room 1a 220125, Minsk, Belarus
business center PORT

Email: info1@eneca.by SiteMap

Phones:

+375 17 393 27 88 +375 29 117 38 63 +375 29 671 97 36 +375 29 255 78 33

About companyCompany HistoryCompany BenefitsLicenses and CertificatesContactsCareersCompany NewsStaff NewsPartnership ProposalCountries we work inBelarusRussiaUkraineKazakhstanEU countriesOutsourcingIndustry SectorsThermal Energy SourcesCogeneration and TrigenerationRenewable Power GenerationEnergy Transport SystemsEnergy Storage SystemDesignDesign of Boiler HousesDesign of mini CHPDesign of CHPDesign of Heat NetworksDesign of Electrical SubstationsDesign of Power LinesDesign of Gas PipelinesDesign of Wind PlantsDesign of Solar PlantsDesign of Biogas PlantsDesign of Gasification FacilitiesAdaptation of ProjectsPredesign WorksInvestment ConsiderationFeasibility Study (FS)Calculation of Fuel RequirementsLoad CalculationsEquipment SelectionInitial Data CollectionEngineering SurveysEnergy AuditEnvironmental ServicesDevelopment of Environmental ProtectionEnvironmental Impact AssessmentDevelopment of Sanitary Protection ZoneDevelopment of Enterprise's Ecological PassportCalculations of Pollutant Dispersion in the Program EcologistEmission InventoryDevelopment of Standards for Allowable Air Pollutant EmissionsWaste InventoryDevelopment of the Instruction on Waste ManagementService Freelance EcologistSoftware for calculation of Air Pollutant EmissionsNoise CalculationsRisk AssessmentArtesian Wells Security ZoneInstruction on industrial environmental controlEconomic WorksCost-effectiveness AnalysisBusiness Plan of Investment ProjectsBusiness Development PlanBusiness Plan for a New VentureMonitoring and Support of Business PlanAssistance in FundraisingCreation of Business Plan Calculation schemeConsulting services on economic calculationsCompleted ProjectsDesignPredesign WorksEnvironmental ServicesEconomic WorksOther industriesIndustryEcologyEconomyTradePower Engineering
Главная страницаPower EngineeringCompleted ProjectsPredesign Works

Predesign Works

 

Feasibility studies

 

Vikrompak

Investigation of wind energy resources at sites Liozno region with the construction of wind turbines and forecasting electricity generation facilities

Vikrompak

Investigation of wind energy resources at sites Orsha region with the construction of wind turbines and forecasting electricity generation facilities

Republican Unitary Enterprise

"Grodnoenergo"

Study on wind energy resources of wind power station construction site near the settlement Grabniki Novogrudok district, Grodno region. with the calculation of power generation project "Construction of a wind energy park near the settlement Grabniki Novogrudok district

International Finance Corporation / «Institute of financial analysis and audit»

The estimation of both  technological and economic potential of timber Processing Complex biomass utilization in the federal District of Russian Federation for the production of electric and thermal energy

Kema Consulting GmbH

Construction of a biomass energy source, Grodno region, Smorgon

Kema Consulting GmbH

Construction of a biomass energy source, Gomel region, Kalinkovichi

Kema Consulting GmbH

Construction of a biomass energy source, Minsk region, Starye Dorogi

Kema Consulting GmbH

Construction of a biomass energy source, Brest region, Bereza

JSC Glass Factory Neman

Power module №3 on the basis of a cogeneration unit container type

Kommunalnik Unitary Municipal Production Enterprise

Reconstruction of the boiler house Sozh with installation of a gas pumping unit and transfer of the boiler to burning natural gas

CJSC KvarMelProm

Production of cellular concrete and sand-lime brick. Mini-CHP

SLC Bellesizdelie

Implementation of cogeneration units at SLC Bellesizdelie

JSC Mineral Wax Plant 

Construction of the production of highly purified paraffin, oils, lubricants, cutting fluids, model compounds with the reconstruction of the energy complex. Trigeneration complex

RUE Production Association Belorusneft

Implementation of micro-turbine units for RUE Production Association Belorusneft

JSC NG-Energo

Development of a pre-feasibility study for the establishment of own energy source generating electricity and heat at LLC Bashkirskaya med 

JSC NG-Energo

Development of a pre-feasibility study for the establishment of own energy source generating electricity and heat at JSC  Uchalinski GOK

LLC Investment Company Sokol

Construction of a multifunctional complex with hotel, sports center and infrastructure in Minsk situated Pobediteley Av.

Santa Bremor LLC

Construction of production shop № 5 Santa Bremor LLC in Brest

MUE Soligorskvodokanal

Replacement of the boiler into the boiler house in the village Rachkovichi, water abstraction Belevichi

JSC Polesie

Construction of the boiler house running on local fuel at the filter plant JSC “Polesie”

Ostrovets Housing and Communal Services UE

Construction of a block-modular boiler house running on local fuel in the village Olkhovka, Ostrovets region

JLLC Europlastic

Heating of renovated building in Bobruisk in 14/1 Dzerzhinsky St., for JLLC Europlastic

Institution of the protection of valuables Zapadny

Reconstruction of the boiler house with replacement of steam boilers and installation of boilers running on local fuel, GPU and absorption refrigerating machine

JSC SlutskFurnitureFactory

Modernization of the boiler house JSC Slutsk Furniture Factory with transfer to local fuel

Kommunalnik Unitary Municipal Enterprise (Klimovichy)

Reconstruction of boiler houses Avtobaza and PMK-88 in Klimovichi

MUE Veska-Emulbit

Modernization of the boiler house located in the village Lyady Minsk region

Vitebskenergo Republican Unitary Enterprise Branch Lukoml State District Power Electric Station

Modernization of the existing boiler house of health complex Sosnovyborof Lukoml SRPP

RUE Vitebskenergo

Construction of a wind farm in Liozna district, Vitebsk region with the express analysis of wind potential

National Bank of the Republic of Belarus Children's Sanatorium Ruzhansky

Construction of solar collector for water heating

JSC GlassFactoryNeman

Reconstruction of the boiler house JSC Glass Factory Neman

Soligorsk District Consumer Society

Construction of a block-modular boiler house at the industrial site of Soligorsk District Consumer Society

Unitary Enterprise “Beltsvetmet”

Construction of the boiler house of Unitary Enterprise “Beltsvetmet” in the village Gatovo, Minsk region

PUE “Molodechno Integrated Food Processing Plant”

Improving of the efficiency of the boiler house by replacing outdated equipment for the new energy-saving equipment

UKS Oshmiany rayspolkom GRUP

Comparison of variants of district heating of multistory residential buildings in Borunskoy St., Oshmyany

PUE Brest Distillery Company Belalco

Increasing of energy efficiency of the boiler at RPUE Brest Distillery Company Belalco

SLS Eterika

Complex of road service on the highway Minsk-Vitebsk, 7(9) km

Inco-Food Ltd., FE

Modernization of the boiler house with installation of GPU

Kamenets Housing and Communal Services Municipal Unitary Multi-Activity Production Enterprise

Integration of a cogeneration unit 1 MW at the boiler house on Industrial St. in Kamenets

Brest Electrotechnical Plant Production Republican Unitary Enterprise

Installation of two gas powered electrical generator in modular construction in the territory of Brest Electrotechnical Plant Production Republican Unitary Enterprise

RUE Vitebskenergo

The transfer of heat loads on the boiler house Uzhnaya Vitebsk CHP

UE Institute Breststroyproekt

Installation of a gas-piston unit at the poultry plant under construction at 5766 million broilers annually in the village Priborovo, Brest region

JSC Grodno Glass Factory

Introduction of electricity cogeneration units

RUE Spetsremont

Development of the section of TM for a feasibility study “Enter energotehnology installation capacity of 1.4 MW to prevent direct burning of gas during the drying”

Unitary Enterprise Agrokombinat Zhdanovichi”

Correction the feasibility study on object “Installation of cogeneration equipment in the greenhouse complex “Bogatyrevo”

Slick Company Ltd.

Construction of mini CHP for the catering complex, with administrative and social infrastructure 65 Pobeditelej Ave., Minsk

Svetlogorsk Vegetable Processing Factory Municipal Agricultural Unitary Enterprise

Building of own energy source at Svetlogorsk Vegetable Processing Factory Municipal Agricultural Unitary Enterprise

RUE “Svetlogorskkormmash”

Reconstruction of heating Sosnovy bor, Svetlogorsk region, with construction of a block boiler house and gas piston unit for RUE Svetlogorskkormmash

JSC Malorita Cannery and Vegetable Drying Plant”

Construction of the boiler house (mini CHP) at JSC Malorita Cannery and Vegetable Drying Plant

Vitebsk Biofactory Private Industrial Unitary Enterprise

Construction of mini CHP for Vitebsk Biofactory Private Industrial Unitary Enterprise

JSC Minsk Hothouse Plant

Installation of a cogeneration unit at JSC Minsk Hothouse Plant”

JSC Minskvodstroy

Reconstruction of greenhouses of MUE Tsvety Stolitsy”with the construction of a gas boiler house

Privod-Turbocon Ltd.

Installation of a steam turbine at the boiler house branch RUE Minsk Engine Plant in Stolbtsy

JSC Zabudova

Construction of mini CHP 4MW at the industrial site JSC Zabudova

Open joint-stock company «Glass-house «Neman»

The boiler house modernization - powering by local fuel types, with capacity of 30 MW

«Gatcha-Osovskoe» factory

The existent boiler house reconstruction with transformation to mini-teploenergocentral by local fuels

«Berezovskoe housing and utilities»

The boiler house construction by local fuels with capacity of 8 MW

«Minskvodokanal» enterprise

Construction of  the sludge  incineration factory

Capital construction and housing of Osmyansky  district executive committee

The comparison of heat supply variants for

projected  sub-district of Multi-storied Exhibit

«BelRosEnergyProject» enterprise

Construction of energy source by local fuel types with capacity of 4 MW

Open joint-stock company «Glass-house «Neman»

The boiler house modernization -powering by local fuel types,  with capacity of 30 MW

«Gatcha-Osovskoe» factory

The existent boiler house reconstruction with transformation to mini-teploenergocentral by local fuels

«Baranovichsky machine-tool plant”,affiliated firm of  Closed Joint-Stock Company«Аtlant»

The boiler house reconstruction with the installation of the boiler by local fuel types with capacity of 8 MW 

«Oshmyanski housing and utilities» enterprise

The boiler house modernization with capacity of 8 MW

Open joint-stock company “Slonimskaya motor-repair service plant”

The heat supply system modernization by  installation of boiler by local fuels with capacity of 1 MW

«BelVIETS» enterprise

The existent boiler house reconstruction with boiler installation by local fuel types ( with capacity of 8 MW)

“Cergeevichskoe», affiliated company of”Mingas”enterprise

The construction of mini-teploenergocentral

“Minskkomunteploset»  enterprise

The existent boiler house reconstruction –powering by local fuels ( with capacity of 3 MW)

“Volkovyiskie public utilities» enterprise

Сonstruction of the boiler house with  mini-teploenergocentral by local fuels  with capacity of 4,27 MW

Gomelenergo RUE

Construction of mini-CHP on local fuels

Brestenergo RUE / OJCS Belvneshenergo

Construction of mini-CHP on local fuels at Prujany