Power Engineering

RUE “Minskenergo” Reconstruction of SS 110/10 kV “Borisov-Severnaya”
RUE “Minskenergo” Reconstruction of SS 110/10 kV “Pleshchenitsy”
RUE “Minskenergo” Reconstruction of SS 110/10 kV “Zhdanovichy”
RUE “Minskenergo” Development of a program of transfer of heating systems of administration and manufacturing buildings RUE “Minskenergo” from electric heating to natural gas and local fuel
RUE “Minskenergo” Construction of SS 110/10 kV “Loshnitsa”
RUE “Grodnoenergo” Expert conclusion of a business-plan project "Grodno-CHP-2. Reconstruction with the installation of gas turbine unit
RUE “Mogilevenergo” Automated monitoring and metering system on the interstate, intersystem flows and generation (EMS MMPG) 2 stage, 5-th launch complex
RUE “Brestenergo” Business plan of the investment project, which includes: “Bereza SRPP. Reconstruction of the blocks № 5 with the add-gas turbines”, “Construction of a high-tension line 330 kV Berezovskaya SRPP - Brest-1 with SS 330 kV Brest-1. The first stage. Construction of a high-tension 330 kV Berezovskaya SRPP - Brest-1 with SS 330 kV Brest-1. FOL”, “Construction of a high-tension line 330 kV Berezovskaya SRPP - Brest-1 with SS 330 kV Brest-1. The second stage. Construction of a high-tension 330 kV Berezovskaya SRPP - Brest-1”, “Expansion of SS 330 kV Baranovichi, Brest region. The second stage of construction.
RUE “Brestenergo” Construction of mini CHP running on local fuel in Pruzhany, Brest region
RUE “Brestenergo” Reconstruction of Brest CHP. Replacement of the turbine № 3
RUE “Brestenergo” Bereza SRPP. Reconstruction of the blocks № 5,6 with the add-gas turbines
RUE “Brestenergo” Increase of the generation of electricity at Baranovichi CHP with transfer of heat load from the boiler house “Severnaya”
RUE “Brestenergo” Reconstruction of SS 110 kV “Severo-Zapadnaya”
RUE “Brestenergo” Programme of optimization (reconstruction) of energy networks Pruzhany region 2010-2011.
RUE “Vitebskenergo” Lukoml SRPP. Reconstruction of power unit №4. Updating of a business plan Lukoml SRPP. Reconstruction of power units №1,2,4. Auxiliary equipment
RUE “Vitebskenergo” Replacement of electrolysis plants at Lukoml SRPP, 1-2 turns
RUE “Vitebskenergo” Reconstruction of sections of heat networks
RUE “Vitebskenergo” Reconstruction of SS 330 kV “Polotskaya” with replacement of high-voltage equipment
RUE “Vitebskenergo” Lukoml SRPP. Reconstruction of 330 kV OS cubicle №6
RUE “Vitebskenergo” Lukoml SRPP. Reconstruction of 330 kV OS cubicle №2
RUE “Vitebskenergo” Reconstruction of SS 110/35/10/6 kV “Orsha-Uzhnaya” in Orsha
RUE “Vitebskenergo” Reconstruction of SS 110/10 kV “Verhovje” with replacement of 10kV CDDEI
RUE “Vitebskenergo” A step down pumping station in the heating main in the central part of Orsha
RUE “Vitebskenergo” Lukoml SRPP. Modernization of power unit
RUE “Vitebskenergo” Vitebsk Electrical Supply Networks. Reconstruction of SS 110/10 kV “Surazhskaya”
RUE “Vitebskenergo” RUE “Vitebskenergo”. Construction of a top-level Electricity Metering System
RUE “Vitebskenergo” Lukoml SRPP. Reconstruction of OS-330 kV cubicle №5
RUE “Vitebskenergo” Construction of 70 MW gas-turbine unit with heat recovery boiler within the framework of the architectural project Vitebsk CHP. Replacing the turbine №2. 2 turn
RUE “Grodnoenergo” Construction of Grodno HPS
RUE “Grodnoenergo” Transfer of boiler loads of part of Grodno at Grodno CHP-2 with the increase of power output of CHP on the heating load
JSC “Pinsk Meat Packing Plant” Construction of the boiler house at the site of JSC “Pinsk Meat Packing Plant” using natural gas as the primary fuel
RUE “Belenergosetproect” Calculation of economic efficiency and EIA justification of investments. Construction of HVL 330 kV Roven NPP - Mikashevichy
Unitary Enterprise “Belizna” Calculation of economic efficiency in the design documentation on project “Installation of stop leak test equipment and replacement of burners of 2 steam boilers DKVR-4/13 in the boiler house of UE “Belizna” in 55 Knorina St., Minsk