About companyCompany HistoryCompany BenefitsLicenses and CertificatesContactsCareersCompany NewsStaff NewsPartnership ProposalCountries we work inBelarusRussiaUkraineKazakhstanEU countriesOutsourcingIndustry SectorsThermal Energy SourcesCogeneration and TrigenerationRenewable Power GenerationEnergy Transport SystemsEnergy Storage SystemDesignDesign of Boiler HousesDesign of mini CHPDesign of CHPDesign of Heat NetworksDesign of Electrical SubstationsDesign of Power LinesDesign of Gas PipelinesDesign of Wind PlantsDesign of Solar PlantsDesign of Biogas PlantsDesign of Gasification FacilitiesAdaptation of ProjectsPredesign WorksInvestment ConsiderationFeasibility Study (FS)Calculation of Fuel RequirementsLoad CalculationsEquipment SelectionInitial Data CollectionEngineering SurveysEnergy AuditEnvironmental ServicesDevelopment of Environmental ProtectionEnvironmental Impact AssessmentDevelopment of Sanitary Protection ZoneDevelopment of Enterprise's Ecological PassportCalculations of Pollutant Dispersion in the Program EcologistEmission InventoryDevelopment of Standards for Allowable Air Pollutant EmissionsWaste InventoryDevelopment of the Instruction on Waste ManagementService Freelance EcologistSoftware for calculation of Air Pollutant EmissionsNoise CalculationsRisk AssessmentArtesian Wells Security ZoneInstruction on industrial environmental controlEconomic WorksCost-effectiveness AnalysisBusiness Plan of Investment ProjectsBusiness Development PlanBusiness Plan for a New VentureMonitoring and Support of Business PlanAssistance in FundraisingCreation of Business Plan Calculation schemeConsulting services on economic calculationsCompleted ProjectsDesignPredesign WorksEnvironmental ServicesEconomic WorksOther industriesIndustryEcologyEconomyTradePower Engineering
Главная страницаPower EngineeringAbout companyCompany NewsCompleted projects.

Completed projects. Mini-CHP running on biogas from whey and waste water. JSC Molodechno Milk Plant in Vilejka.

The company ENECA has experience in design of mini-CHP running on biogas. For example, at JSC Molodechno Milk Plant in Vilejka was built a biogas complex and installed a gas-pumping unit. The biogas production complex has an active fermenter, a secondary fermenter, a buffer capacity, etc. Biogas is produced from whey and waste water. It is planned to process 54750 tons of whey and 36500 tons of waste water per year. Combustion heat of biogas – 4800 kkal/m3. Specifications of the gas-pumping unit using biogas as a primary fuel: installed thermal capacity is 0,234 Gcal per hour, electrical capacity – 320 kW.